STANDARD RENTAL PERIOD

The standard rental period is three days. Additional days are $35 per day and must be approved because the dumpster may be committed to another customer. Delivery and pickup timing are confirmed directly by phone, text, or email.

HOW TO SCHEDULE

01

Call, text, or email with the delivery address, preferred delivery date, project description, and exact material type.

02

We recommend the proper dumpster and confirm price, included weight, rental period, availability, material rules, and placement requirements.

03

We send payment instructions or a payment link by text or email.

04

The order is confirmed only after Crestline Dumpster Rental accepts the job and any required payment is completed.

05

When the dumpster is ready for pickup, call, text, or email. Pickup is routed according to access and availability.

FILL-LINE AND SAFE-LOADING RULES

Material must remain at or below the top edge of the dumpster.

1.png

Nothing may stick above the top, hang over the sides, or extend through the rear door.

2.png

The load must be reasonably level and stable for safe transport.

3.png

Do not load while the rear door is unsecured.

4.png

Do not attempt to move the dumpster with personal equipment or vehicles.

5.png

Do not burn material inside the dumpster.

6.png

Do not allow unauthorized dumping by neighbors or third parties.

7.png

PLACEMENT AND SITE PREPARATION

The customer must choose a firm, reasonably level, and accessible placement area. The truck and dumpster are heavy and may damage asphalt, concrete, pavers, landscaping, septic systems, underground utilities, or other surfaces.

8.png

Clear vehicles, gates, branches, wires, equipment, and other obstacles before delivery and pickup.

9.png

Provide enough truck width, overhead clearance, and straight-line access for a safe roll-off delivery. When access is uncertain, send photos before scheduling.

10.png

Tell us about narrow roads, steep grades, tight turns, soft ground, low wires, trees, gates, or limited turnaround before scheduling.

11.png

The customer is responsible for identifying septic systems, underground utilities, irrigation, pavers, and weak surfaces.

12.png

Protective boards may be used when practical, but surface protection cannot be guaranteed.

13.png

If placement is in a street, public right-of-way, or restricted area, the customer is responsible for obtaining any required permit unless otherwise agreed in writing.

​DELIVERY, PICKUP, RELOCATION, AND LOADING FEES

Dry run or inaccessible delivery/pickup

$175

Blocked pickup after arrival

$175

Dumpster relocation after delivery

$175

Overfilled, unsafe, or above-the-rail load: starting at

$100

plus any additional labor, dry-run, or disposal charges

Special disposal items

Call/Text/Email

for current pricing and approval

Additional rental day

$35/Day

subject to availability

Excess disposal weigh

$135/Ton

prorated according to actual scale weight

WEATHER AND SCHEDULE LANGUAGE

Delivery and pickup times are estimates and may change due to traffic, weather, landfill conditions, equipment issues, road access, or earlier jobs. We will communicate meaningful delays as soon as practical.